![]() Company (MOS 31E, old MOS 95C), and adding a MOS 31E staff NCO to the S3 section of the UR battalion. The development of a I/R battalion package that uses one of four current UR Detachment (MOS 95B) and the company headquarters and two platoons from one of two Guard Companies to form a UR. On 4 Sep 03, the CSA approved the redesign and force structure recommendations contained in the USAMPS Out-of-Cycle FDU packet. Therefore, on 20 Nov 02, and as a result of Operation Enduring Freedom (OEF) and Gauntanamo Bay (JTF-GTMO) HRD internment operations, the Army G3 (LTG Cody) directed a "bottom-up review" (BUR) of MOS 95C and 95B MP force structure to assess US prisoner confinement and internment/resettlement (I/R) operations, to make the Active Component MOS 95C soldiers more deployable and the reserve component MP UR battalions more flexible to meet both deployment and prison facility backfill rotation requirements. The new HRD category of UR populace is significant in that, unlike the assumption of a nonbelligerent EPW population, the HRD as considered belligerent and hostile to internment forces, and the requisite skill set to manage HRD is found in MOS 95C. Without an equal number of additional MOS 95B bill payers for theīattalion and detachment positions, the RCF would not be able to function if the MOS 95CĪs a result of Global War on Terrorism (GWOT) operational requirements, the capability to provide short and long-term internment of High Risk Detainees (HRD) was established as a mission requirement. The MOS reversal also resulted in the FORSCOM withdrawal for the partialĬonversion of the Ft Lewis Regional Confinement Facility (RCF) Table of Distribution andĪllowances (TDA) to form an UR Battalion headquarters (with USAR positions) and two URĮPW Detachments. This approval was also applied to the affect ARNG Citing the forthcoming MP Commandant recommendation, the Director, Force Programs (BG Odierno) approved (9 Feb 00) the USAR FY 02 Command Plan request for exception to standardization toĭocument affect positions as MOS 95B. ![]() In Mar 00, as a result of further coordination and with the exception of the new FR Confinement Detachment, the MP Commandant (BG Ryder) announced the reversal of MOS 95C (FR) back to MOS 95B(MP) in all FR designs. In late 1999, citing reclassification, retention and recruitment challenges, the USAR withdrew their support for the conversion of all MOS 95B (Military Police) positions to the new MOS 95C (Internment/Resettlement). As part of the concept and subsequent training development processes, representatives from the 300th MP EPW Command, 800th MP EPW Brigade, and the US Disciplinary Barracks (USDB) participated. The MOS for all enlisted documented as 95C (FR) in all organizations. The proposal also redefined and expanded MOS 95C (now MOS 31 E), and associated MOS training, from Corrections (US Military prisoners) to Internment/Resettlement (all FR populations). The modules, along with the separate MP Guard Company, were building blocks based on the size of the FR populace being supported. While the procedures will vary by category of the FR populace (EPW, US military prisoners, DC), the functions of sheltering, sustaining, guarding/protecting, and population accounting are fundamentally the same.Ĭreation of a standard FR battalion headquarters with a confinement (US military prisoners) and a EPW (EPW and DC) detachments. On 6 Feb 96, the US Army Military Police School (USAMPS) submitted the operational concept for Internment/Resettlement Operations as part of the Force Design Update (FDU) 96-1 process. ![]() The evolution of Force XXI Operations in the mid 1990's emphasized the requirement for the Army to conduct joint, multinational operations in all operational environments (war, conflict, peace), and that a large portion of Army operations will be population control. The end result was additional force structure to support Army war fight and daily operational requirements. To provide the historical evolution and issues pertaining to the designs of Military Police units conducting enemy prisoner of war (EPW), US military prisoner confinenient, high risk detainee (HRD) interment operations, and displaced civilian (DC) resettlement operations.Īs a result of Operation Desert Storm EPW operations, the Army recognized the need to correct the artificially reduced EPW planning factors and EPW unit design constrains imposed under the 1983-85 Army of Excellence (AOE) redesign. SUBJECT: Military Police Internment/Resettlement Unit Designs
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |